Published February 2000
| Version v1
Report
Installation and alignment of KEKB magnets
- 1. High Energy Accelerator Research Organization, Tsukuba, Ibaraki (Japan)
- 2. Hitachi Techno Co. Ltd., Tokyo (Japan)
Description
KEKB is an asymmetric-energy two ring collider(1) built to do experiments on CP violation in B particle decays(2). The KEKB ring was constructed in the pre-existing TRISTAN tunnel. The construction was started in January 1996, and completed in November 1998. For alignment of the magnets, laser trackers were used in the arc sections, and the stretched wire method was adopted in the straight sections. Installation and alignment of the magnets have been carried out successfully. (author)
Additional details
Identifiers
- URL
- http://www.kek.jp;
Publishing Information
- Imprint Title
- Proceedings of international workshop on performance improvement of electron-positron collider particle factories
- Imprint Pagination
- 306 p.
- Journal Page Range
- p. 213-216
- Report number
- KEK-PROC--99-24
Conference
- Title
- international workshop on performance improvement of electron-positron collider particle factories
- Acronym
- e+e- Factories '99
- Dates
- 21-24 Sep 1999
- Place
- Tsukuba, Ibaraki (Japan)
INIS
- Country of Publication
- Japan
- Country of Input or Organization
- Japan
- INIS RN
- 32004297
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- ALIGNMENT; BEAM BENDING MAGNETS; BEAM FOCUSING MAGNETS; COLLIDING BEAMS; ELECTRON BEAMS; INSTALLATION; JAPANESE ORGANIZATIONS; POSITIONING; POSITRON BEAMS; STORAGE RINGS
- Descriptors DEC
- BEAMS; EQUIPMENT; LEPTON BEAMS; MAGNETS; NATIONAL ORGANIZATIONS; PARTICLE BEAMS
Optional Information
- Notes
- 7 refs., 5 figs., 3 tabs.