Published 1991 | Version v1
Report

The Pacesetter mine model

Creators

Description

As part of Syncrude Canada's continuing efforts to improve operations, its oil sands mine was compared to other surface mines in order to determine possible areas of improvement. The two basic tools used in this process were influence diagrams, which capture pictorially all of the factors that may affect a particular outcome, and benchmarking, which allows mathematical relationships to be developed for the various influences. These relationships estimate the magnitude of the influence on an outcome and allow prediction of changes in outcomes when an influence is changed. A model was developed, using data from four different mines, to make the comparisons with Syncrude's operation. The results show that Syncrude could improve costs by ca 10% if all of the superior methods and ideas used at other mines could be adopted. 1 fig

Additional details

Publishing Information

Imprint Title
CIM [Canadian Institute of Mining and Metallurgy] fifth district five meeting 1991
Imprint Pagination
[862 p.].
Journal Page Range
p. 1-12, Paper 70.
Report number
CIM--CE04277

Conference

Title
5. CIM District Five Meeting.
Dates
17-20 Sep 1991.
Place
Fort McMurray (Canada).

INIS

Country of Publication
Canada
Country of Input or Organization
Canada
INIS RN
24036423
Subject category
S04: OIL SHALES AND TAR SANDS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
BENCHMARKS; EVALUATION; OIL SAND MINING; ORGANIZATIONAL MODELS; SURFACE MINING
Descriptors DEC
MINING

Optional Information

Secondary number(s)
CONF-9109456--; CE--04277.