Published 2001
| Version v1
Journal article
Refurbishment of hydropower generation plants
Description
This article presents the factors taken into consideration and the methods used for the management of refurbishment work in the hydropower installations of the TUWAG - a Tyrolean hydropower company in Austria. The technical and financial advantages to be gained from refurbishment are discussed and the requirements placed on the structuring of refurbishment projects are described. Various factors such as plant operation and maintenance, increased returns through better efficiency and cost reduction through lower wear and tear and reduced risk of failure are discussed. Annexes to the article cover monitoring and measurement techniques, the simulation of mechanical and hydraulic conditions, profitability calculations and turbine management
Additional details
Additional titles
- Original title (German)
- Refurbishment in Wasserkraftwerken. Sanierungs- und Erneuerungsprojekte mit strukturiertem Stufenkonzept
Publishing Information
- Journal Title
- Bulletin des Schweizerischen Elektrotechnischen Vereins und des Verbandes Schweizerischer Elektrizitaetswerke
- Journal Volume
- 2
- Journal Page Range
- p. 25-29
- ISSN
- 1420-7028
INIS
- Country of Publication
- Switzerland
- Country of Input or Organization
- Switzerland
- INIS RN
- 34004441
- Subject category
- S13: HYDRO ENERGY;
- Descriptors DEI
- AUSTRIA; COMPUTERIZED SIMULATION; ECONOMICS; ENERGY EFFICIENCY; FAILURES; HYDROELECTRIC POWER PLANTS; MAINTENANCE; MONITORING; OPERATION; PROFITS; RETROFITTING
- Descriptors DEC
- DEVELOPED COUNTRIES; EFFICIENCY; EUROPE; POWER PLANTS; SIMULATION; WESTERN EUROPE