Published 2001 | Version v1
Journal article

Refurbishment of hydropower generation plants

Creators

  • 1. TIWAG - Tiroler Wasserkrafte AG, Innsbruck (Austria)

Description

This article presents the factors taken into consideration and the methods used for the management of refurbishment work in the hydropower installations of the TUWAG - a Tyrolean hydropower company in Austria. The technical and financial advantages to be gained from refurbishment are discussed and the requirements placed on the structuring of refurbishment projects are described. Various factors such as plant operation and maintenance, increased returns through better efficiency and cost reduction through lower wear and tear and reduced risk of failure are discussed. Annexes to the article cover monitoring and measurement techniques, the simulation of mechanical and hydraulic conditions, profitability calculations and turbine management

Additional details

Additional titles

Original title (German)
Refurbishment in Wasserkraftwerken. Sanierungs- und Erneuerungsprojekte mit strukturiertem Stufenkonzept

Publishing Information

Journal Title
Bulletin des Schweizerischen Elektrotechnischen Vereins und des Verbandes Schweizerischer Elektrizitaetswerke
Journal Volume
2
Journal Page Range
p. 25-29
ISSN
1420-7028

INIS

Country of Publication
Switzerland
Country of Input or Organization
Switzerland
INIS RN
34004441
Subject category
S13: HYDRO ENERGY;
Descriptors DEI
AUSTRIA; COMPUTERIZED SIMULATION; ECONOMICS; ENERGY EFFICIENCY; FAILURES; HYDROELECTRIC POWER PLANTS; MAINTENANCE; MONITORING; OPERATION; PROFITS; RETROFITTING
Descriptors DEC
DEVELOPED COUNTRIES; EFFICIENCY; EUROPE; POWER PLANTS; SIMULATION; WESTERN EUROPE