Published July 1990 | Version v1
Report Open

Kesterson crisis: Sorting out the facts

  • 1. Lawrence Berkeley Lab., CA (United States)
  • 2. Bureau of Reclamation, Sacramento, CA (United States). Mid-Pacific Region

Description

The Kesterson Reservoir was planned as a regulating facility to control drainage water discharges into the San Joaquin-Scaramento River Delta from the ''San Luis Drain'' which was to dispose of salt-ladin agricultural water. Anticipated environmental impacts of the Kesterson operations focused almost exclusively on problems related to seepage and water-logging of nearby lands. Reuse of drainage water for wetlands focused on excessive salinity. Drainage water entered the reservoir in 1978. By 1983 elevated levels of selenium were found with selenium poisoning causing deformed embryos of water birds, adult bird mortality and their poor reproductive success. An estimated 9000 kg of selenium was delivered to Kesterson between 1981 to 1986. This paper details the chronology of the Kesterson crisis and environmental remediation. 20 refs., 1 fig

Availability note (English)

MF available from INIS under the Report Number; OSTI as DE92000808; NTIS; INIS; US Govt. Printing Office Dep.

Files

23014341.pdf

Files (282.5 kB)

Name Size Download all
md5:b48b33240811240280346446585a40f5
282.5 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
8 p.
Report number
LBL--30587

Conference

Title
National conference on irrigation and drainage engineering.
Dates
11-13 Jul 1990.
Place
Durango, CO (United States).

Optional Information

Contract/Grant/Project number
Contract AC03-76SF00098
Funding organization
Department of the Interior, Washington, DC (United States).
Secondary number(s)
CONF-9007225--1.