Chute Silo ILW Project Berkeley - 16649

  • 1. Aquila Nuclear Engineering Ltd, Aquila House, Hazeley Enterprise Park, Hazeley Road, Twyford, Hampshire, SO21 1QA (United Kingdom)

Description

Magnox, a Tier 1 Site Licensed Company (SLC), is the management and operations contractor responsible for the decommissioning of twelve of the Nuclear Decommissioning Authority's (NDA) nuclear sites in the UK. Aquila Nuclear Engineering is a specialist Tier 3, turnkey engineering company based in the UK, delivering mission critical engineering solutions to Europe's nuclear and nuclear medicine industries. Berkeley Nuclear Power Station, Berkeley, England started generating electricity in 1962, ceasing operation 27 years later in 1989. The Chute Silo ILW Project at this Reactor Site had been set up to retrieve irradiated control rods and charge chutes disposed of within a subterranean vault (silo). The project involved in-silo size reduction of waste in to 30-35 waste baskets. The waste basket was then to be retrieved via a pintle grab and hoist mechanism in to a Transfer Flask (through a silo and a Transfer Flask gamma gate). The Transfer Flask was then to transit along existing crane rails, out of the silo building and over the top of an Import/Export Facility. A Ductile Cast Iron Container (DCIC) was to be imported into Import/Export Facility and inspected/prepared to receipt the waste basket from the Transfer Flask. Once filled, the DCIC was then to be sealed and exported to an on-site storage facility. Due to an issue with the Magnox Tier 2 Framework holder in delivering a cost effective and viable solution for their Chute Silo ILW Retrieval Project, Magnox took the ground breaking decision to 'self-perform'. This involved dividing the larger project into several smaller packages. Two of these packages - for the shielded Transfer Flask and the Import/Export facility - were put out for competitive tendering directly to the Tier 3 Supply Chain. The work completed by the Tier 2 Company was shared with the Tier 3's, but Magnox expressly requested the Tier 2 proposals were scrutinised and that far more cost effective, robust and simpler solutions were provided for within the Tier 3 Tenders. Aquila won both work packages and delivered them with significant and demonstrable cost savings, on time and under budget. This was achieved by the collaborative arrangements between Aquila and Magnox, the methodologies of both company's project teams and the innovation and 'fitness for purpose' of Aquila's design pragmatism. The original Tier 2 Framework holder's price to Magnox for the Chute Silo ILW Project was between UK Pounds 2-3 M. Aquila delivered the equivalent scope for under UK Pounds 1 M. Aquila's original programme was maintained despite the award of additional scope and (Magnox) delays on site. Aquila came under the original target price for each discrete phase of the project. The above was achieved because of: - the collaborative arrangements between Aquila and Magnox; - the methodologies of both company's project teams; - the design features put forward by Aquila (welcomed and adopted by Magnox). In 2014 Aquila Nuclear Engineering received formal recognition of its achievements on this project by winning an NDA Supply Chain Award for 'Best example of supplier 'going the extra mile''. Points highlighted in the award were: - improved customer focus, leading to stronger relationships - encouraging challenge and innovation - continuous suggestions for improvement - UK Pounds 1 million savings and three months programme reduction

Availability note (English)

Available from: WM Symposia, Inc., PO Box 27646, 85285-7646 Tempe, AZ (US)

Additional details

Publishing Information

Imprint Pagination
11 p.
Report number
INIS-US--19-WM-16649

Conference

Title
42. Annual Waste Management Symposium
Acronym
WM2016
Dates
6-10 Mar 2016
Place
Phoenix, AZ (United States)

Optional Information

Notes
available online at: http://archive.wmsym.org/2016/index.html