Twenty years of in-service-inspection of concrete structures in Belgian NPPs
Creators
- 1. Tractebel Engineering, Bruxelles (Belgium)
- 2. Electrabel, Bruxelles (Belgium)
Description
The 7 Belgian power reactors were built in the years 1969-1985 and are located in 2 sites Doel and Tihange. Every reactor building has a primary containment (steel or pre-stressed concrete) and an outer containment in reinforced concrete. Belgian NPPs have to comply with the requirements of US regulations, and more specifically with ASME for the containments and ACI-349 for seismic category 1 structures. Moreover, it has been decided to perform a full in-service-inspection (ISI) program for structures that are not themselves safety related but whose damage could be dangerous for other safety related structures. For a convenient organisation of inspection campaigns, concrete structures have been categorised into 4 domains. Primary containments are in a specific domain. Indeed their ISI program is fully determined by codes. Domain A is for the structures that can be inspected only during an outage of the plant: internal structures of the reactor building, water in-take galleries... Domain B is for structures or part of structures located is in the controlled area (one year of inspection periodicity). Domain C is for structures that can be inspected without special operational contingencies (3 years of inspection periodicity). Inspection procedures have then been written. They take into account the specificities of each site and of each structure. Moreover the feedback experience cumulated over 20 years of reactor operations has been used to focus inspectors' attention on specific substructures where damage can be expected first
Additional details
Publishing Information
- Imprint Title
- Ageing Management of Thick-Walled Concrete Structures, Including ISI, Maintenance and Repair, Instrumentation Methods and Safety Assessment in View of LTO. Workshop Proceedings
- Imprint Pagination
- 721 p.
- Journal Page Range
- p. 649-669
- Report number
- NEA-CSNI-R--2009-9
Conference
- Title
- Workshop on Ageing Management of Thick-Walled Concrete Structures, Including ISI, Maintenance and Repair, Instrumentation Methods and Safety Assessment in View of LTO
- Dates
- 1-3 Oct 2008
- Place
- Prague (Czech Republic)
INIS
- Country of Publication
- Nuclear Energy Agency of the OECD (NEA)
- Country of Input or Organization
- Nuclear Energy Agency of the OECD (NEA)
- INIS RN
- 49020822
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; S42: ENGINEERING;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- AGING; CONTAINMENT BUILDINGS; DOEL-1 REACTOR; DOEL-2 REACTOR; DOEL-3 REACTOR; DOEL-4 REACTOR; IN-SERVICE INSPECTION; MECHANICAL STRUCTURES; REACTOR MAINTENANCE; REACTOR SAFETY; REINFORCED CONCRETE; TIHANGE REACTOR; TIHANGE-2 REACTOR; TIHANGE-3 REACTOR
- Descriptors DEC
- BUILDING MATERIALS; BUILDINGS; COMPOSITE MATERIALS; CONCRETES; CONTAINMENT; ENRICHED URANIUM REACTORS; INSPECTION; MAINTENANCE; MATERIALS; OPERATION; POWER REACTORS; PWR TYPE REACTORS; REACTOR LIFE CYCLE; REACTOR OPERATION; REACTORS; REINFORCED MATERIALS; SAFETY; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Notes
- 3 refs.