Pre-tightening force calibration test research for stud without measuring rod of HTR-PM

  • 1. Chinergy Co.Ltd., Beijing (China)
  • 2. Nuclear and Radiation Safety Center, Ministry of Ecology and Environment, Beijing (China)
  • 3. Huaneng Shandong Shidao Bay Nuclear Power Co., Ltd., Rongcheng (China)

Description

In order to control the final pre-tightening force of the stud without measuring rod in the high temperature gas cooled reactor Pebble Module (HTR-PM) and ensure the sealing of the reactor primary circuit pressure boundary, it is necessary to calibrate the pre-tightening force of the stud. Taking the M56 stud without measuring rod as an example, the calibration test was carried out with a bolt tensioner, and the relation curve between the pre-tightening force and the final pre-tightening force of the stud was found. The final pre-tightening force on the stud was smaller than the pre-tightening force of the bolt tensioner when the nut was tightened. The reason of the force decreasing was analyzed. The relation formula between the pre-tightening force and the final pre-tightening force of the stud was established through the constitutive relation theory of material mechanics. It was shown that the final pre-tightening force and its relation between the pre-tightening force obtained from the test were close to the theoretical analysis results. Under the same output force of the bolt tensioner, the final pre-tightening force of the actual equipment nozzle flange studs will be larger than the calibrated value, but this is good for the sealing. (authors)

Additional details

Identifiers

Publishing Information

Journal Title
Nuclear Power Engineering
Journal Volume
41
Journal Issue
6
Journal Page Range
p. 167-171
ISSN
0258-0926

Optional Information

Notes
3 figs., 1 tab., 15 refs.; http://dx.doi.org/10.13832/j.jnpe.2020.06.0167