Published 2003 | Version v1
Miscellaneous Open

Evaluation of implementation 18-month cycle in NPP Krsko

  • 1. NPP Krsko Engineering Service Division, Krsko (Slovenia)

Description

The feasibility study, which evaluates the impacts of the transition to the 18-month cycle on plant design bases, operational and maintenance requirements, long-term economics of the operation, is performed. Activities, which have to be implemented for adopting 18- month cycle, are presented. The study shows that implementation of 18-month cycle is possible with some investments through transition 15-month cycle. (author)

Files

36115790.pdf

Files (226.1 kB)

Name Size Download all
md5:25fc0c4dcc2134407a6cbc6c4171fd18
226.1 kB Preview Download
Part of:
Proceedings of the International Conference Nuclear Energy for New Europe 2003

Additional details

Publishing Information

Publisher
Nuclear Society of Slovenia
Imprint Place
Ljubljana (Slovenia)
ISBN
961-6207-21-0
Imprint Title
Proceedings of the International Conference Nuclear Energy for New Europe 2003
Imprint Pagination
827 p.
Journal Page Range
[7 p.]
Report number
INIS-SI--05-001

Conference

Title
International Conference Nuclear Energy for New Europe 2003
Dates
8-11 Sep 2003
Place
Portoroz (Slovenia)

INIS

Country of Publication
Slovenia
Country of Input or Organization
Slovenia
INIS RN
36115790
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
EVALUATION; FUEL CYCLE; IMPLEMENTATION; KRSKO REACTOR; LIFE CYCLE ASSESSMENT; SAFETY ANALYSIS
Descriptors DEC
ENRICHED URANIUM REACTORS; POWER REACTORS; PWR TYPE REACTORS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS

Optional Information

Notes
27 refs. Imprint:665 refs., 126 tabs., 520 figs.