Published 2003
| Version v1
Miscellaneous
Open
Evaluation of implementation 18-month cycle in NPP Krsko
Description
The feasibility study, which evaluates the impacts of the transition to the 18-month cycle on plant design bases, operational and maintenance requirements, long-term economics of the operation, is performed. Activities, which have to be implemented for adopting 18- month cycle, are presented. The study shows that implementation of 18-month cycle is possible with some investments through transition 15-month cycle. (author)
Files
36115790.pdf
Files
(226.1 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:25fc0c4dcc2134407a6cbc6c4171fd18
|
226.1 kB | Preview Download |
Additional details
Publishing Information
- Publisher
- Nuclear Society of Slovenia
- Imprint Place
- Ljubljana (Slovenia)
- ISBN
- 961-6207-21-0
- Imprint Title
- Proceedings of the International Conference Nuclear Energy for New Europe 2003
- Imprint Pagination
- 827 p.
- Journal Page Range
- [7 p.]
- Report number
- INIS-SI--05-001
Conference
- Title
- International Conference Nuclear Energy for New Europe 2003
- Dates
- 8-11 Sep 2003
- Place
- Portoroz (Slovenia)
INIS
- Country of Publication
- Slovenia
- Country of Input or Organization
- Slovenia
- INIS RN
- 36115790
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- EVALUATION; FUEL CYCLE; IMPLEMENTATION; KRSKO REACTOR; LIFE CYCLE ASSESSMENT; SAFETY ANALYSIS
- Descriptors DEC
- ENRICHED URANIUM REACTORS; POWER REACTORS; PWR TYPE REACTORS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Notes
- 27 refs. Imprint:665 refs., 126 tabs., 520 figs.