Published January 2005 | Version v1
Report Open

Simulations of a DIII-D plasma disruption with the NIMROD code

  • 1. Tech-X Corporation, Boulder, CO (United States)
  • 2. SAIC, San Diego, CA (United States)

Description

To investigate the dynamics of the disruption of DIII-D discharge number 87009, two types of initial-value simulations with the NIMROD code were performed to investigate different characteristics. In the first set of simulations, a conducting wall was placed on the last close flux surface, and an equilibrium that was close to the ideal-MHD marginal stability point was created. A heating source was added to the pressure equation to drive the plasma equilibrium through an ideal-MHD instability point. Excellent agreement with analytic theory was obtained. To investigate how the stored energy is deposited on the wall, free-boundary simulations were performed with an ideal-MHD unstable equilibria. The unstable modes grow until the magnetic islands overlap and the magnetic field is stochastic over a large part of the plasma domain. The rapid stochastization of the field allows the plasma to lose two thirds of its internal energy in approximately 200 microseconds in qualitative agreement with the experiment. The deposition of thermal energy on the wall is localized poloidally and toroidally on the wall due to helically-localized temperature gradients and the rapid parallel heat conduction which carries this heat flux to the wall. (author)

Files

36090373.pdf

Files (365.9 kB)

Name Size Download all
md5:5d56d0cbb0efcc4c85765b12cfc796fc
365.9 kB Preview Download
Part of:
20th IAEA fusion energy conference 2004. Conference proceedings

Additional details

Publishing Information

ISBN
92-0-100405-2
Imprint Title
20th IAEA fusion energy conference 2004. Conference proceedings
Imprint Pagination
3451 p.
Journal Issue
no. 25/CD
Series
C and S papers series
Journal Page Range
[8 p.]
ISSN
1562-4153
Report number
IAEA-CSP--25/CD

Conference

Title
20. IAEA fusion energy conference 2004
Dates
1-6 Nov 2004
Place
Villamoura (Portugal)

Optional Information

Contract/Grant/Project number
Contract DE-FE03-02ER5466
Notes
9 refs, 5 figs
Secondary number(s)
TH/P2--25