Published 2019 | Version v1
Miscellaneous

Development of the tandem undulators for the cERL-FEL

  • 1. High Energy Accelerator Research Organization (KEK), Accelerator Laboratory, Tsukuba, Ibaraki (Japan)

Description

At the KEK compact Energy Recovery Linac (cERL), we are constructing two undulators as a light source for the cERL-FEL project. The period length of undulators are 24 mm and the periodicity number is 124. The target wave length region of cERL-FEL undulator is from 10 μm to 20 μm. We designed cERL-FEL undulators as adjustable phase undulator (APU) with fixed gap of 10 mm. We describe the design of the cERL-FEL undulators in this report. (author)

Availability note (English)

Available from https://www.pasj.jp/web_publish/pasj2019/proceedings/PDF/FRPI/FRPI018.pdf
Part of:
Proceedings of the 16th annual meeting of Particle Accelerator Society of Japan

Additional details

Additional titles

Original title (Japanese)
cERL自由電子レーザー用アンジュレータの開発

Publishing Information

Imprint Title
Proceedings of the 16th annual meeting of Particle Accelerator Society of Japan
Imprint Pagination
[1296 p.]
Journal Page Range
p. 1064-1065

Conference

Title
16. annual meeting of Particle Accelerator Society of Japan
Acronym
PASJ2019
Dates
31 Jul - 3 Aug 2019
Place
Kyoto (Japan)

Optional Information

Notes
3 refs., 4 figs., 1 tab. Imprint:#7B2C#16#56DE# #65E5##672C##52A0##901F##5668##5B66##4F1A##5E74##4F1A#