Saint John lateral pipeline project: comprehensive study report
Description
A descripion is given of the results of an environmental impact assessment of the construction of a natural gas pipeline that will bring gas from Maritimes and Northeast Pipeline Management Ltd.'s (M and NP) main transmission pipeline to clients in Lake Utopia and Saint John, NB. It will be 110 km long, and the Saint John lateral will join the mainline approximately 2 km south of Big Kedron Lake, NB. Various institutional, industrial, commercial and residential clients will be able to access the pipeline in the future, and it is intended to be capable of future expansion for markets along its route and for markets that become economically feasible in the future. A matrix was developed that relates environmental resources to Environmental Components of Concern (ECCs), and to the rationale for exclusion/inclusion of the ECC as a Valued Environmental Component (VECs). The positive benefits of the pipeline to clients in the Saint John area include: reduced dependence on foreign oil, fuel switching and price competition, lower air emission pollution, increased energy efficiency, and a source of energy that is secure and reliable. VECs were selected based on: concerns of various stakeholders including the public, community groups, scientific parties, Aboriginal groups, government officials and agencies, relevant regulations; relevant literature; and past evaluation experiences, including future developments of the proposed study area. Further selection of the VECs required an examination of the issues picked out via scoping to determine the ways in which the overall project could affect the ECCs, and included construction, operation, decommissioning/abandonment, malfunctions and accidents of the pipeline. The phases of the project as they impacted residually and cumulatively on the VECs were evaluated, and impacts on Valued Socio-Economic Components (VSCs) were assessed also. The mitigation efforts taken will minimize the potential effects of the project on VECs and VSCs. For all of the project phases it is expected that residual effects will be without significance as will be the overall environmental impact. 29 refs
Availability note (English)
Available from the Canadian Environmental Assessment Agency, 200 Sacre-Coeur Blvd., Hull, PQ, or through interlibrary loan from the CANMET Information Centre, 555 Booth St., Ottawa, ON, K1A 0G1, tel: (613)995-4132 or FAX: (613) 995-8730Additional details
Publishing Information
- Publisher
- Maritimes and Northeastern Pipelines Co.
- Imprint Place
- Fredericton, NB (Canada)
- Imprint Pagination
- 172 p.
INIS
- Country of Publication
- Canada
- Country of Input or Organization
- Canada
- INIS RN
- 31028636
- Subject category
- S03: NATURAL GAS;
- Resource subtype / Literary indicator
- Non-conventional Literature
- Descriptors DEI
- ACCIDENTS; CONSTRUCTION; ENVIRONMENTAL EFFECTS; ENVIRONMENTAL IMPACTS; EVALUATION; MITIGATION; NATURAL GAS; PIPELINES; SOCIO-ECONOMIC FACTORS
- Descriptors DEC
- ENERGY SOURCES; FLUIDS; FOSSIL FUELS; FUEL GAS; FUELS; GAS FUELS; GASES; INSTITUTIONAL FACTORS