Dam removal methods, Elwha River, Washington
Creators
- 1. Ebasco Services, Inc., Bellevue, WA (United States)
- 2. Kent State Univ., OH (United States). Dept. of Geology
Description
This paper reports on preparation of an Environmental Impact Statement (FERC, 1991) for licence applications for the Elwha and Glines Canyon hydroelectric projects on the Elwha River, Washington, which included evaluation of dam retention and dam removal alternatives. Alternative methods for meeting resource objectives were evaluated for cost, engineering, and environmental constraints. Alternatives that were evaluated included dam retention with the addition of fish passage facilities, removal of both dams, and removal of either the Elwha or Glines Canyon Dam. Comparative environmental and economic evaluations necessitated the formulation of specific dam removal plans. The plans are considered reasonable approximations of actual dam removal programs for assessment purposes
Additional details
Publishing Information
- Publisher
- American Society of Civil Engineers.
- Imprint Place
- New York, NY (United States)
- ISBN
- 0-87262-816-7
- Imprint Title
- Proceedings of the 1991 national conference on hydraulic engineering
- Imprint Pagination
- 1178 p.
- Journal Page Range
- p. 668-673.
Conference
- Title
- National conference on hydraulic engineering.
- Dates
- 29 Jul - 2 Aug 1991.
- Place
- Nashville, TN (United States).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 23078962
- Subject category
- S13: HYDRO ENERGY; S13: HYDRO ENERGY;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- DAMS; DESIGN; ECONOMIC IMPACT; ENVIRONMENTAL IMPACTS; EVALUATION; HYDROELECTRIC POWER PLANTS; PLANNING; RIVERS; US FERC; WASHINGTON
- Descriptors DEC
- DEVELOPED COUNTRIES; NATIONAL ORGANIZATIONS; NORTH AMERICA; POWER PLANTS; SURFACE WATERS; US DOE; US ORGANIZATIONS; USA
Optional Information
- Secondary number(s)
- CONF-9107229--.