Loss of benefits resulting from mandated nuclear plant shutdowns

Description

This paper identifies and discusses some of the important consequences of nuclear power plant unavailability, and quantifies a number of technical measures of loss of benefits that result from regulatory actions such as licensing delays and mandated nuclear plant outages. The loss of benefits that accompany such regulatory actions include increased costs of systems generation, increased demand for nonnuclear and often scarce fuels, and reduced system reliability. This paper is based on a series of case studies, supplemented by sensitivity studies, on hypothetical nuclear plant shutdowns. These studies were developed by Argonne in cooperation with four electric utilities

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS, PC A02/MF A01; 1 as DE83007737.

Files

14769464.pdf

Files (435.9 kB)

Name Size Download all
md5:fd7ed6f97b445402c9cbe0b2a29c4ae6
435.9 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
20 p.
Report number
CONF-8208117--1

Conference

Title
modeling and decisionmaking.
Acronym
Conference on generation planning
Dates
10 - 12 Aug 1982.
Place
Chattanooga, TN (USA).