Development of a natural circulation post-decay heat removal system for future breeder reactors
Creators
- 1. Internationale Atomreaktorbau G.m.b.H. (INTERATOM), Bergisch Gladbach (Germany, F.R.)
Description
The German partners in European breeder cooperation, which is based on government agreements of 1976 and 1984 and on corresponding industrial agreements, are expected to make important contributions especially to the safety of fast breeder power plants. The European partners therefore have decided to build another large scale test facility on the premises of Interatom in Bergisch Gladbach. The facility is to be used for testing a new type of post-decay heat removal system for breeder power plants, which has been developed by Interatom and by means of which the safety of the European Fast Reactor (EFR) can be switched to a system incorporating no active safery measures. This, at the same time, would be a measure of cost reduction. The ILONA facility is estimated to cost DM 26,5 million and is to be funded with a considerable contribution from the German Federal Ministry for Research and Technology (BMFT). Construction has begun in the summer of 1988; the envisaged startup date is early 1990. (orig.)
Abstract (German)
Im Rahmen der europaeischen Brueterzusammenarbeit, die auf Regierungsabkommen aus den Jahren 1976 und 1984 sowie entsprechenden Abkommen von Herstellern, Industrie und Forschungszentren beruht, werden von der deutschen Seite wichtige Beitraege, vor allem zur Sicherheit von Schnellbrueter-Kernkraftwerken erwartet. Deshalb stimmten die europaeischen Partner dem deutschen Vorschlag zu, auf dem Interatom-Gelaende in Bergisch Gladbach eine weitere Grossversuchsanlage zu errichten. In dieser soll ein von Interatom entwickeltes neuartiges passives Nachwaermeabfuhrsystem fuer Brueterkraftwerke getestet werden, mit dem die Sicherheit der Nachwaermeabfuhr des Europaeischen Schnellen Reaktors (EFR) unter gleichzeitiger Kostensenkung erhoeht werden soll. Diese Anlage ILONA (Interatom Luftkuehleroptimierung Nachwaermeabfuhr) wird auf 26,5 Mio. DM veranschlagt und einen erheblichen Zuschuss vom Bundesministerium fuer Forschung und Technologie (BMFT) erhalten. Mit ihrem Bau ist im Sommer 1988 begonnen worden. Ihre Betriebsaufnahme wird fuer Anfang 1990 angestrebt. (orig.)Additional details
Additional titles
- Original title (German)
- Entwicklung eines Nachwaermeabfuhrsystems mit Naturumlauf
Publishing Information
- Journal Title
- Atomwirtschaft, Atomtechnik
- Journal Volume
- 33
- Journal Issue
- 10
- Series
- Atomwirtsch., Atomtech.
- Journal Page Range
- 481-483
- ISSN
- 0365-8414
- CODEN
- AWAKA
INIS
- Country of Publication
- Germany
- Country of Input or Organization
- Germany
- INIS RN
- 20003893
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- AFTER-HEAT REMOVAL; CHROMIUM-NICKEL STEELS; FLOW RATE; HEAT EXCHANGERS; LMFBR TYPE REACTORS; MOCKUP; NATURAL CONVECTION; OPTIMIZATION; PILOT PLANTS; PRESSURE DROP; RESEARCH PROGRAMS; SODIUM; TUBES
- Descriptors DEC
- ALKALI METALS; ALLOYS; BREEDER REACTORS; CARBON ADDITIONS; CHROMIUM ALLOYS; CONVECTION; ELEMENTS; ENERGY TRANSFER; EPITHERMAL REACTORS; FAST REACTORS; FBR TYPE REACTORS; FUNCTIONAL MODELS; HEAT TRANSFER; HIGH ALLOY STEELS; IRON ALLOYS; IRON BASE ALLOYS; LIQUID METAL COOLED REACTORS; METALS; NICKEL ALLOYS; REACTORS; STAINLESS STEELS; STEELS; STRUCTURAL MODELS