Published August 2004 | Version v1
Journal article

Beam test of multi-bunch energy compensation system in the accelerator test facility at KEK

  • 1. The Graduate Univ. for Advanced Studies, School of Mathematical and Physical Science, Dept. of Accelerator Science, Tsukuba, Ibaraki (Japan)
  • 2. High Energy Accelerator Research Organization, Tsukuba, Ibaraki (Japan)

Description

A beam test of the multi-bunch energy compensation system (ECS) was performed using the ΔF method with the 2856±4.327 HMz accelerating structures in the accelerator test facility (ATF) at KEK. The 1.54 GeV S-band linac of the ATF was designed to accelerate a multi-bunch beam the consists of 20 bunches with 2.8 ns spacing. The multi-bunch beam with 2.0 x 1010 electrons/bunch has an energy deviation of about 8.5% at the end of the linac due to transient beam loading without ECS. The ATF linac is the injector of the ATF damping ring (DR), whose energy acceptance is ±0.5%. The beam loading compensation system is necessary in the ATF linac for the successful injection of multi-bunch into DR. The rf system of the linac consists of 8 regular rf units with the SLED system and 2 ECS rf units without the SLED system. The accelerating structures of the regular units are driven at 2856 MHz and the 2 ECS structures are operated with slightly different rf frequencies of 2856±4.327 MHz. In the beam test, we have succeeded in compressing the multi-bunch energy spread within the energy acceptance of the DR using ΔF ECS. The principle of the beam loading compensation system of KEK-ATF and the experimental results are described in this paper. (author)

Additional details

Publishing Information

Journal Title
Japanese Journal of Applied Physics. Part 1, Regular Papers, Short Notes and Review Papers
Journal Volume
43
Journal Issue
8A
Journal Page Range
p. 5617-5622
ISSN
0021-4922

Optional Information

Notes
19 refs., 11 figs., 1 tab.