Published 1987 | Version v1
Book

New multi-microprocessor control system of the main ring magnet power supply for the KEK 12 GeV PS

  • 1. National Lab. for High Energy Physics, Oho-machi, Tsukuba-gun, Ibaraki-ken, 305 (Japan)

Description

The new control computer system has been installed at the last June. The main cpu supervised by the Unix covers man-machine interfacing and correction of current deviation in periodic control algorithm. The two sub-cpu are linked by a LAN and supported by a real time multi-task monitor. The one as the output process controller distributes 15 control patterns to 16-bit D/A converters at every 1.67 ms synchronized 6 phase ac line. The other as the input logs B Qf and Qd magnet current and voltage by 7 sets of 16-bit ADC at the same clock. Resulting precision of the currents from beam injection to flat top would be estimated at about a resolution limit of ADC except for current ripple. Ripple currents estimated at several times of an intrinsic ripple in the DCCT

Additional details

Publishing Information

Publisher
IEEE Service Center.
Imprint Place
Piscataway, NJ (USA)
Imprint Title
Proceedings of the 1987 IEEE particle accelerator conference: Accelerator engineering and technology
Journal Page Range
p. 689-691.

Conference

Title
Particle accelerator conference.
Dates
16-19 Mar 1987.
Place
Washington, DC (USA).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
19084026
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
ALGORITHMS; ARRAY PROCESSORS; BEAM INJECTION; GEV RANGE; KEK SYNCHROTRON; MAGNETS; MAN-MACHINE SYSTEMS; ON-LINE CONTROL SYSTEMS; REAL TIME SYSTEMS
Descriptors DEC
ACCELERATORS; COMPUTERS; CONTROL SYSTEMS; CYCLIC ACCELERATORS; DIGITAL COMPUTERS; ENERGY RANGE; EQUIPMENT; ON-LINE SYSTEMS; SYNCHROTRONS