Published August 31, 1999 | Version v1
Report Open

242-A MCS Logic Acceptance Test Report for Year 2000 Upgrade

Description

242-A Evaporator distributive control system upgrade to D/3 version 9.0-2 for year 2000 compliance. Testing was performed per test procedure HNF-3568. There were no unresolved exceptions. The system responded correctly to all testing and meets the requirements to operate the 242-A This report documents the acceptance test results for the Evaporator facility

Availability note (English)

Available from INIS in electronic form; Also available from OSTI as DE00797664; PURL: https://www.osti.gov/servlets/purl/797664-AbLRJv/webviewable/

Files

34009222.pdf

Files (2.4 MB)

Name Size Download all
md5:e0a9b8f4c5eb0bd0ddc2d2a03c4bc1a6
2.4 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
123 p.
Report number
HNF--3569

Optional Information

Contract/Grant/Project number
AC06-96RL13200
Funding organization
ENVIRONMENTAL MANAGEMENT (United States)