Published 1974 | Version v1
Report Restricted

AVR nuclear test power plant. 2. and 3. Quarterly report 1974 (1.4.1974 - 30.9.1974)

Description

Automatic translation: The most important operating data of the AVR experimental nuclear power plant in the 2nd and 3rd quarters of 1974 are Tables I and II and the figures 1 to 8 in the appendix. From March 29 to April 1, 1974 the nuclear power plant was closed due to a lack of personnel left with the shift supervisors over the weekend (see quarterly report 1/1974). On April 16, 1974 the power plant was used to change the test pipe in the VAMPYR hot gas loop and to replace the dust filter. During this shutdown, minor repairs and Maintenance work to be carried out. About the most important repair and maintenance work is described in Chapter VI. reported.

Abstract (German)

Die wichtigsten Betriebsdaten des AVR-Versuchskernkraftwerkes im 2. und 3. Quartal 1974 sind Tabelle I und II sowie den Abbildungen 1 bis 8 im Anhang zu entnehmen. Vom 29. 3. bis 1. 4. 1974 wurde das Kernkraftwerk wegen Personalmangels bei den Schichtleitern über das Wochenende abgefahren (siehe Quartalsbericht 1/1974). Am 16.4.1974 wurde das Kraftwerk zum Wechsel des Proberohrs im Heißgasloop VAMPYR und zum Austausch des Staubfilters abgefahren. In dieser Abschaltpause konnten kleinere Reparatur- und Wartungsarbeiten durchgeführt werden. Über die wichtigsten Reparatur- und Wartungsarbeiten wird in Kapitel VI. berichtet.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Additional titles

Original title (German)
AVR Atomversuchskraftwerk. 2. und 3. Quartalsbericht 1974 (1.4.1974 - 30.9.1974)

Publishing Information

Imprint Pagination
72 p.
Report number
INIS-DE--21M1357

Optional Information

Notes
Document from Juelich Preservation Project; 25 figs., 14 tabs.