CNAAA spent fuel complementary storage building (UFC) construction and licensing: an overview of current status
Creators
- 1. Eletrobras Eletronuclear S.A. (ELETRONUCLEAR), Rio de Janeiro, RJ (Brazil)
Description
The reprocessing of nuclear fuel assemblies could be a valuable solution in order to make available additional energy resources and also to decrease the volume of discarded materials. After the burning of nuclear fuel assemblies to produce electrical energy, these components have to be stored in the spent fuel pools of each unit, for at least 10 years, in order to decrease their residual heat. Even after this initial 10 year-period, these spent fuel assemblies still have a great amount of energy, which can be reused. Nowadays, the spent fuel materials can be reprocessed in order to produce electrical energy, or be stored to provide, in the future, an opportunity to decide how these materials will be treated. At the present moment, Brazil does not plan to reprocess these spent fuels assemblies, as performed by some other countries. Thus, Brazil intends to build a spent fuel long term intermediate storage facility to allow the chance to make a decision in the future, taking into account the available technology at that time. Considering the three CNAAA units (Angra 1, 2 and 3 of Central Nuclear Almirante Alvaro Alberto, the Brazilian nuclear power plant, located at Angra dos Reis county, Rio de Janeiro state) have a life time estimated in 60 years, and the intrinsical spent fuel pools storage capacity of these units, a Spent Fuel Complementary Storage Building - UFC has to be foreseen in order to increase the storage capacity of CNAAA. Therefore, the Spent Fuel Complementary Storage Building shall be in operation in 2018, capable to receive the first spent fuel assemblies from Angra 2 and, in the next year, from Angra 1. The same procedure will be applied for the spent fuel assemblies of Angra 3, currently in construction. The Spent Fuel Complementary Storage Building will be constructed and operated by Eletrobras Eletronuclear - the CNAAA owner - and will be located at the same site of the plant. Conceptually, the UFC will be built as a wet storage modality, representing a similar solution used in all the three CNAAA units to store the spent fuel assemblies. Taking into account the above described aspects, this paper aims to compare the licensing requirements included in the safety analysis report prepared for external spent fuel wet storage facilities in USA (NRC Regulatory Guide) and Switzerland (ENSI - Swiss Federal Nuclear Safety Inspectorate), considering that the standard formats applied by CNEN - the Brazilian Nuclear Regulatory Authority - are based on USNRC recommendations and Eletrobras Eletronuclear plans, as a preliminary idea, to take the Goesgen NPP - KKG (Switzerland) spent fuel facility as a reference one for of the UFC. (author)
Files
45092872.pdf
Files
(1.1 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:e34251cd5372347ed05746101d9b6e13
|
1.1 MB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 17 p.
- Report number
- INIS-BR--14420
Conference
- Title
- international nuclear atlantic conference
- Acronym
- INAC 2013
- Dates
- 24-29 Nov 2013
- Place
- Recife, PE (Brazil)
INIS
- Country of Publication
- Brazil
- Country of Input or Organization
- Brazil
- INIS RN
- 45092872
- Subject category
- S12: MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- ANGRA-1 REACTOR; ANGRA-2 REACTOR; ANGRA-3 REACTOR; BRAZILIAN CNEN; COMMISSIONING; CONSTRUCTION; DESIGN; GEOLOGY; LICENSING; SEISMOLOGY; SPENT FUEL STORAGE; STORAGE FACILITIES
- Descriptors DEC
- BRAZILIAN ORGANIZATIONS; ENRICHED URANIUM REACTORS; NATIONAL ORGANIZATIONS; POWER REACTORS; PWR TYPE REACTORS; REACTORS; STORAGE; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Notes
- 28 refs., 8 figs.,