ITER Magnet Systems - from Qualification to Full Scale Construction

Creators

  • 1. Japan Atomic Energy Agency, Ibaraki (Japan)

Description

Full text: The ITER requires superconducting magnet systems, which consist of 18 Toroidal Field (TF) coils, one Central Solenoid (CS), and 6 Poloidal Field (PF) coils, 18 (9 pairs) Correction Coils (CC), and additional components such as feeders, current leads, and instrumentation feedthroughs, and so on. Six Domestic Agencies (DAs), EURATOM (EU), China (CN), Japan (JA), Korea (KO), Russian Federation (RF), and United States of America (US), are involved in the procurement sharing of the components of the ITER magnet systems and their constructions have been implemented under more than 20 Procurement Arrangements (PAs) signed between the ITER Organization (IO) and 6 DAs. During recent years, qualification activities have good progress and full scale constructions have been started in TF conductors. Four jacketing lines have been set-up and qualified in EU, CN, JA, and RF, and one jacketing line has been constructed in US. The JA, RF, CN, and KO/EU has already started full scale construction of TF conductors, especially, JA has completed 25 conductors by the end of March 2012. The latest topic is the delivery of the 660-m dummy conductor manufactured by CN to JA. It is the first ITER component completed in CN and also first shipment between DAs under cooperation with the IO, CN, and JA. The qualification of radial plate manufacture has almost completed in both EU and JA, and both DAs are ready for full scale construction. JA has also qualified full manufacturing processes such as winding, heat treatment, insulation, and impregnation with a 1/3 prototype prior to the qualification by the full scale prototype. Two full scale mock-ups of basic segments of TF coil structure were manufactured in Phase II to optimize and industrialize manufacturing process of TF coil structure. A preparation of the full scale construction of TF coil winding is under way in EU manufacturer, and contracts for full scale construction of TF coil and structure will be placed in JA in July 2012. A building for PF coil manufacture has been constructed in the ITER site in February 2012. The US and JA have started to manufacture dummy CS conductors with a collaborative work for trial wining in US. The constructions of other components of the ITER magnet systems are also going well toward to the first plasma in 2020. (author)

Part of:
24. IAEA Fusion Energy Conference. Programme and Book of Abstracts

Additional details

Publishing Information

Imprint Title
24. IAEA Fusion Energy Conference. Programme and Book of Abstracts
Imprint Pagination
789 p.
Journal Page Range
p. 555
Report number
IAEA-CN--197

Conference

Title
24. IAEA Fusion Energy Conference
Acronym
FEC 2012
Dates
8-13 Oct 2012
Place
San Diego, CA (United States)

INIS

Country of Publication
International Atomic Energy Agency (IAEA)
Country of Input or Organization
International Atomic Energy Agency (IAEA)
INIS RN
45033974
Subject category
S70: PLASMA PHYSICS AND FUSION TECHNOLOGY;
Resource subtype / Literary indicator
Conference
Descriptors DEI
CARBON NITRIDES; HEAT TREATMENTS; ITER TOKAMAK; MANUFACTURING; SOLENOIDS; SUPERCONDUCTING MAGNETS
Descriptors DEC
CARBON COMPOUNDS; CLOSED PLASMA DEVICES; ELECTRIC COILS; ELECTRICAL EQUIPMENT; ELECTROMAGNETS; EQUIPMENT; MAGNETS; NITRIDES; NITROGEN COMPOUNDS; PNICTIDES; SUPERCONDUCTING DEVICES; THERMONUCLEAR DEVICES; THERMONUCLEAR REACTORS; TOKAMAK DEVICES; TOKAMAK TYPE REACTORS

Optional Information

Secondary number(s)
ITR/2--4