Published 1990
| Version v1
Book
First operation of a full-size superconducting cavity unit in LEP
Creators
- 1. CERN, Geneva (Switzerland)
Description
The results of the commissioning and first operation in LEP of a full-size superconducting cavity module are reported. It was operated in the laboratory at a total accelerating voltage of 32 MV. RF power generation, distribution and controls are similar to the LEP copper RF system already in operation. Liquid helium is supplied by a 1 kW refrigerator with the cold box in the klystron tunnel 30 m distant from the cryostat. Initial operating experience on the acceleration of LEP beams, higher order mode excitation, the RF and cryogenic system and controls are described. (author) 11 refs.; 2 figs
Additional details
Publishing Information
- Publisher
- Editions Frontieres.
- Imprint Place
- Paris (France)
- ISBN
- 2-86332-090-4
- Imprint Title
- Particle Accelerator. Volume 1
- Imprint Pagination
- 376 p.
- Journal Page Range
- p. 152-154.
Conference
- Title
- 2. European Particle Accelerator Conference.
- Dates
- 12-16 Jun 1990.
- Place
- Nice (France).
INIS
- Country of Publication
- France
- Country of Input or Organization
- France
- INIS RN
- 23019549
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- CAVITY RESONATORS; CRYOGENICS; GEV RANGE 10-100; LEP STORAGE RINGS; PERFORMANCE; RF SYSTEMS; SUPERCONDUCTING DEVICES
- Descriptors DEC
- ELECTRONIC EQUIPMENT; ENERGY RANGE; EQUIPMENT; GEV RANGE; RESONATORS; STORAGE RINGS