Published November 1997 | Version v1
Report Open

Operational experience with the Sizewell B integrated plant computer system

  • 1. Nucler Electric, Sizewell (United Kingdom)
  • 2. Westinghouse Process Control Division (United States)

Description

The Westinghouse Integrated System for Centralised Operation (WISCO) is the primary plant control system at the Sizewell B Power Station. It comprises three subsystems; the High Integrity Control System (HICS), the Process Control System (PCS) and the Distributed Computer system (DCS). The HICS performs the control and data acquisition of nuclear safety significant plant systems. The PCS uses redundant data processing unit pairs. The workstations and servers of the DCS communicate with each other over a standard ethernet. The maintenance requirements for every plant system are covered by a Maintenance Strategy Report. The breakdown of these reports is listed. The WISCO system has performed exceptionally well. Due to the diagnostic information presented by the HICS, problems could normally be resolved within 24 hours. There have been some 200 outstanding modifications to the system. The procedure of modification is briefly described. (A.K.)

Files

29000387.pdf

Files (94.8 kB)

Name Size Download all
md5:2502c1a2979ee9af4f360ce48e964118
94.8 kB Preview Download
Part of:
Synovial cysts of the lunate bone: how the NMR imaging rectifies the Kienboeck's disease diagnosis

Additional details

Publishing Information

Imprint Title
Proceedings of the International topical meeting on VVER instrumentation and control
Imprint Pagination
361 p.
Journal Page Range
p. 184-187.
Report number
INIS-CZ--0008

Conference

Title
International topical meeting on VVER instrumentation and control.
Dates
21-24 Apr 1997.
Place
Prague (Czech Republic).

Optional Information