Published December 1991 | Version v1
Miscellaneous Open

ITER assembly and maintenance

Description

This document is intended to describe the work conducted by the ITER Assembly and Maintenance (A and M) Design Unit and the supporting home teams during the ITER Conceptual Design Activities, carried out from 1988 through 1990. Its content consists of two main sections, i.e., Chapter III, which describes the identified tasks to be performed by the A and M system and a general description of the required equipment; and Chapter IV, which provides a more detailed description of the equipment proposed to perform the assigned tasks. A two-stage R and D program is now planned, i.e., (1) a prototype equipment functional tests using full scale mock-ups and (2) a full scale integration demonstration test facility with real components (vacuum vessel with ports, blanket modules, divertor modules, armor tiles, etc.). Crucial in-vessel and ex-vessel operations and the associated remote handling equipment, including handling of divertor plates and blanket modules will be demonstrated in the first phase, whereby the database needed to proceed with the engineering phase will be acquired. The second phase will demonstrate the ability of the overall system to execute the required maintenance procedures and evaluate the performance of the prototype equipment

Availability note (English)

MF available from INIS under the Report Number.

Files

23024373.pdf

Files (5.2 MB)

Name Size Download all
md5:639b0a8ab615c5a96a7c4bb0e3d8175b
5.2 MB Preview Download

Additional details

Additional titles

Augmented title (English)
International Thermonuclear Experimental Reactor

Publishing Information

Imprint Pagination
257 p.
Journal Issue
No. 34
Series
ITER documentation series.
Report number
INIS-mf--13100