Main problems of increasing labour productivity in the power plant construction
Creators
Description
The reserve for labour productivity growth in power-, industrial- and civil engineering in the USSR Minenergo system are discussed. Such reserve comprises: introduction of effective designs, increase of technological readiness of structures; a higher mechanization level in construction, improvement of industrial organization, economical and social aspects. Decrease of labour inputs in NPP construction will be attained by using unified designs of serial WWER-1000, RBMK-1000- and RBMK-1500 reactors as well as by developing nuclear power construction complexes-industrial-construction enterprises for manufacturing and transport of special structures as well as for performing civil engineering and installation work on the ground part of the reactor building and special structure. Other potentialities for increasing labour productivity in NPP construction are considered
Additional details
Additional titles
- Original title (Russian)
- Основные задачи энергостроителей в повышении производительности труда
Publishing Information
- Journal Title
- Ehnerg. Stroit.
- Journal Issue
- no.4
- Series
- Ehnerg. Stroit.
INIS
- Country of Publication
- USSR
- Country of Input or Organization
- USSR
- INIS RN
- 16039462
- Subject category
- S29: ENERGY PLANNING, POLICY AND ECONOMY;
- Descriptors DEI
- CONSTRUCTION; HYDROELECTRIC POWER PLANTS; LWGR TYPE REACTORS; NUCLEAR INDUSTRY; NUCLEAR POWER PLANTS; PRODUCTIVITY; STANDARDIZATION; THERMAL POWER PLANTS; TIME DEPENDENCE; USSR; WORK; WWER TYPE REACTORS
- Descriptors DEC
- DEVELOPED COUNTRIES; ENRICHED URANIUM REACTORS; EUROPE; GRAPHITE MODERATED REACTORS; INDUSTRY; NUCLEAR FACILITIES; POWER PLANTS; POWER REACTORS; PWR TYPE REACTORS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS