Reinforcement course 2013. Challenges at the operation end of nuclear power plants
Description
The reinforcement course 2013 of the Nuclear Forum in Switzerland dedicated itself to the question, of which challenges are implicated by decommissioning and dismantling nuclear power plants. The course has been divided into 4 blocks, discussing concepts regarding decommissioning, special points such as organisational or psychological aspects as well as juridical and practical questions. Around 140 persons accepted the invitation of the committee for educational questions under the patronage of Urs Weidmann, head of the nuclear power plant Beznau. Altogether 17 presentations dealt with the following topics: 'Strategies and Steps of Decommissioning' by Roger Lundmark, 'Decommissioning from the Perspective of the Swiss Regulatory Authority' by Hannes Haenggi, 'Operating Period Management Using the Example of the Nuclear Power Plant Leibstadt' by Johannis Noeggerath, 'Questions and Concepts from the Perspective of a Nuclear Power Plant Operator' by Roland Schmidiger, 'Decommissioning of nuclear facilities in the UK' by Andrew Munro, 'Practical experiences of transferring nuclear power plants from operating to out of operation' by Gerd Reinstrom, 'Dismantling of Nuclear Facilities: From the Pilot Scheme to Industrialized Disassembling' by Anke Traichel and Thomas Seipolt, 'Organisational challenges: From Decommissioning Strategy to Decommissioning Targets' by Michael Kruse, Anton von Gunten, Julia Heizinger, Joerg Sokoll, 'Knowing That and Knowing How - Motivational Aspects of Safety-Related Knowledge Management for the Post-Operational phase and dismantling' by Frank Ritz, 'The Juridical Frame of Decommissioning' by Peter Koch, 'The Path to the Decommissioning Order and its Guidelines Ensi-G17' by Torsten Krietsch, 'Requirements for a Safe and Economical Decommissioning From the Perspective of the Operator' by Anton Von Gunten, Michael Kruse, Thomas Herren, Erwin Neukaeter, Mario Radke and Anton Schegg, 'Evaluation of Activation Distribution in a Nuclear Power Plant as Part of the Dismantling Planning' by Ben Volmert, Beat Bitterli, Erwin Neukaeter and Manuel Pantelias; 'Strategies of dismantling - Technical Feasibility and Nuclear Safety' by Hans Genthner and Erwin Prechtl, 'Logistic Supply Chains at the Dismantling Process of Nuclear Power Plants' by Karl Wasinger and Claudius Grasnick, 'Decontamination in Swiss Nuclear Industry - An Overview Based on Experiences of Zwilag' by Uwe Kasemayer, Donat Gubler, Stefan Haefeli, Christian Hoesli, Hans-Joachim Lau and Andreas Wegmueller as well as 'Dismantling Technics and Methods from the Scientific Perspective' by Sascha Gentes. (orig.)
Additional details
Additional titles
- Original title (German)
- Vertiefungskurs 2013. Herausforderungen am Betriebsende von Kernkraftwerken
Publishing Information
- Journal Title
- Atw. Internationale Zeitschrift fuer Kernenergie
- Journal Volume
- 59
- Journal Issue
- 3
- Journal Page Range
- p. 179-182
- ISSN
- 1431-5254
INIS
- Country of Publication
- Germany
- Country of Input or Organization
- Germany
- INIS RN
- 51085200
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Descriptors DEI
- ATOMIC ENERGY LAWS; BEHAVIOR; DECOMMISSIONING; DECONTAMINATION; FEASIBILITY STUDIES; KNOWLEDGE MANAGEMENT; LECTURES; LEGAL ASPECTS; LEIBSTADT REACTOR; NUCLEAR INDUSTRY; NUCLEAR POWER PLANTS; PLANNING; REACTOR DISMANTLING; REACTOR OPERATION; REACTOR OPERATORS; REACTOR SAFETY; SWITZERLAND
- Descriptors DEC
- BWR TYPE REACTORS; CLEANING; DEMOLITION; DEVELOPED COUNTRIES; DOCUMENT TYPES; ENRICHED URANIUM REACTORS; EUROPE; INDUSTRY; LAWS; MANAGEMENT; NUCLEAR FACILITIES; OPERATION; PERSONNEL; POWER PLANTS; POWER REACTORS; REACTOR LIFE CYCLE; REACTORS; SAFETY; THERMAL POWER PLANTS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS; WESTERN EUROPE
Optional Information
- Notes
- This record replaces 45049377