Published April 1984
| Version v1
Report
Sputter source elevation
Description
The elevation of our sputter source to improve beam transmission through our FN tandem, as mentioned in last year's annual report, was largely completed and evaluated in the fall of 1983. The original 25 keV source, its frame and vacuum system, associated isolated power supplies, their rack, deionized cooling water lines, light pipe telemetry, the 100 keV Dowlish accelerating tube, and the 10 kVA isolation transformer have all been tested to 60 keV elevation (for a total injected beam energy of 85 keV.)
Additional details
Publishing Information
- Imprint Title
- Nuclear Physics Laboratory annual report
- Journal Page Range
- p. 76.
- Report number
- DOE/ER/40048--102-L4
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 17078350
- Subject category
- S43: PARTICLE ACCELERATORS; S43: PARTICLE ACCELERATORS;
- Descriptors DEI
- BEAM BENDING MAGNETS; BEAM CURRENTS; BEAM INJECTION; BEAM TRANSPORT; ION SOURCES; POLARIZED BEAMS; SPUTTERING; TANDEM ELECTROSTATIC ACCELERAT
- Descriptors DEC
- ACCELERATORS; BEAMS; CURRENTS; ELECTROSTATIC ACCELERATORS; EQUIPMENT; MAGNETS