Published June 1, 2007 | Version v1
Report

The conceptual design of a new transfer line from booster to recycler for the Fermilab Proton plan phase 2 campaign

Description

Upon the termination of the Fermilab Collider program, the current Recycler anti-proton storage ring (RR) will be converted to a proton pre-injector for the Main Injector (MI) synchrotron. This is scheduled to increase the beam power for the 120 GeV Neutrino program to upwards of 700KW. A transport line that can provide direct injection from the Booster to the Recycler while preserving direct injection from the Booster into the Main Injector and the 8 GeV Booster Neutrino program will be discussed, and its concept design will be presented

Availability note (English)

Available from http://lss.fnal.gov/cgi-bin/find_paper.pl?conf-07-285.pdf; PURL: https://www.osti.gov/servlets/purl/917430-LQNoNY/

Additional details

Publishing Information

Imprint Pagination
3 p.
Report number
FERMILAB-CONF--07-285-AD

Conference

Title
Particle Accelerator Conference 2007
Acronym
PAC 07
Dates
25-29 Jun 2007
Place
Albuquerque, NM (United States)

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
39095595
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
ACCELERATORS; DESIGN; FERMILAB; NEUTRINOS; PROTONS; STORAGE RINGS; TRANSPORT
Descriptors DEC
BARYONS; ELEMENTARY PARTICLES; FERMIONS; HADRONS; LEPTONS; MASSLESS PARTICLES; NATIONAL ORGANIZATIONS; NUCLEONS; US DOE; US ORGANIZATIONS

Optional Information

Contract/Grant/Project number
AC02-76CH03000
Funding organization
US Department of Energy (United States)