Acceptance for Beneficial Use Pumping Instrumentation and Control Skid N

Description

This is a final Acceptance for Beneficial Use (ABU) for Pumping and Instrumentation Control (PIC) skid ''N''. PIC skid ''N'' is ready for pumping tank U-109. All the testing and documentation has been completed as required on the AE3U checklist. This AE3U covers only the readiness of the PIC skid ''N''. Other U-farm preparations including dilution tank fabrication, portable exhauster readiness, leak detection, valve pit preparation, and the Operation Control Station readiness are not part of this ABU. PIC skid ''N'' is a new skid fabricated and tested at Site Fabrication Services. The skid controls the jet pump and monitors various instruments associated with the pumping operation. This monitoring includes leak detection along the waste transfer route and flammable gases in the pump pit. This Acceptance for Beneficial Use documents that Pumping Instrumentation and Control (PIC) skid ''N'' is ready for field use. This document does not cover the field installation or operational testing

Availability note (English)

Available from INIS in electronic form; Also available from OSTI as DE00801863; PURL: https://www.osti.gov/servlets/purl/801863-eSYQMC/webviewable/

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
7 p.
Report number
RPP--5491

Optional Information

Contract/Grant/Project number
EDT-624878; AC27-99RL14047
Funding organization
ENVIRONMENTAL MANAGEMENT (United States)