Factors determining the UK's back-end nuclear fuel cycle strategy and future nuclear systems
Creators
- 1. Thorp Group, British Nuclear Fuels plc, Risley, Warrington, Cheshire (United Kingdom)
Description
Nuclear generating capacity in the UK is static with no units currently under construction. The AGRs and the UK's only PWR, Sizewell B, are operated by British Energy Generation Ltd (BEGL) and British Energy Generation (UK) Ltd (BEG(UK)L), who are subsidiaries of British Energy plc (BE) which was privatised in July 1996. Ownership of the Magnox stations, which were excluded from this privatisation, has now been transferred to BNFL.Government policy on spent fuel management in the UK is that it is for the owners of the spent fuel to decide on the appropriate spent fuel management options, based on their own commercial judgement, subject to meeting the necessary regulatory requirements. The main factors which have predominantly determined UK utility decisions on spent fuel management, to date, have been based on the technical considerations of the spent fuel characteristics, economic attractiveness of the options and at reactor site spent fuel storage capacities. To date, reprocessing has been the dominant form of spent fuel treatment in the UK. Spent fuel storage facilities consist of a mixture of at-reactor stores and large, centralised ponds associated with the reprocessing activities which take place at the Sellafield site. BEGL and BEG(UK)L have contracts for the lifetime arisings of AGR fuel which allow for all AGR spent fuel to be sent to Sellafield for reprocessing or long-term storage. The prompt reprocessing of all Magnox fuel will continue, and spent PWR fuel will continue to be stored at the reactor site in the short to medium term. It is likely that a combination of factors, which are discussed later in this paper, will continue to affect back-end nuclear fuel cycle strategy and future nuclear systems. (author)
Files
33022387.pdf
Files
(120.0 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:3b0bed52568766e9d56fbdc9f99bfea1
|
120.0 kB | Preview Download |
Additional details
Publishing Information
- Imprint Title
- Factors determining the long term back end nuclear fuel cycle strategy and future nuclear systems. Proceedings of a technical committee meeting
- Imprint Pagination
- 211 p.
- Journal Page Range
- p. 187-192
- ISSN
- 1011-4289
- Report number
- IAEA-TECDOC--1286
Conference
- Title
- Technical committee meeting on factors determining the long term back end nuclear fuel cycle strategy and future nuclear systems
- Dates
- 8-10 Nov 1999
- Place
- Vienna (Austria)
INIS
- Country of Publication
- International Atomic Energy Agency (IAEA)
- Country of Input or Organization
- International Atomic Energy Agency (IAEA)
- INIS RN
- 33022387
- Subject category
- S11: NUCLEAR FUEL CYCLE AND FUEL MATERIALS; S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- AGR TYPE REACTORS; MAGNOX TYPE REACTORS; PROLIFERATION; PWR TYPE REACTORS; REPROCESSING; SELLAFIELD REPROCESSING PLANT; SPENT FUEL STORAGE; SPENT FUELS; UNITED KINGDOM; URANIUM RECYCLE
- Descriptors DEC
- DEVELOPED COUNTRIES; ENERGY SOURCES; ENRICHED URANIUM REACTORS; EUROPE; FUEL CYCLE; FUEL REPROCESSING PLANTS; FUELS; GAS COOLED REACTORS; GCR TYPE REACTORS; GRAPHITE MODERATED REACTORS; MATERIALS; NATURAL URANIUM REACTORS; NUCLEAR FACILITIES; NUCLEAR FUELS; POWER REACTORS; REACTOR MATERIALS; REACTORS; SEPARATION PROCESSES; STORAGE; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS; WESTERN EUROPE
Optional Information
- Notes
- 1 tab