Published September 1987 | Version v1
Journal article

Putting Tepco's tenth BWR into operation at Fukushima

  • 1. Tokyo Electric Power Co., Inc. (Japan)
  • 2. Tokyo Electric Power Co. Inc., Operations Dept. Fukushima (Japan)

Description

The fourth and final unit of Fukushima II (Daiini) is scheduled for entry into commercial operation in August 1987. The design evolution represented by the ten Fukushima units is summarised. Operating experience is discussed and the measures taken to reduce radiation exposure are detailed. A number of design innovations incorporated into Fukushima II, compared with Fukushima I (Daiichi), are described. (U.K.)

Additional details

Publishing Information

Journal Title
Nucl. Eng. Int.
Journal Volume
32
Journal Issue
398
Series
Nucl. Eng. Int.
Journal Page Range
47-49
ISSN
0029-5507
CODEN
NEINB