Published January 2011 | Version v1
Miscellaneous

A study on the behaviour of concrete lining and rock mass during shaft excavation at the Horonobe URL project. Part 2

  • 1. Japan Atomic Energy Agency, Geological Isolation Research and Development Directorate, Horonobe, Hokkaido (Japan)
  • 2. Taisei Corporation, Nuclear Facilities Division, Tokyo (Japan)
  • 3. Taisei Corporation, Sapporo Branch, Sapporo, Hokkaido (Japan)

Description

The authors investigated concrete lining stress caused by excavation of a 6.5 m diameter access shaft at the Horonobe Underground Research Laboratory. They analyzed lining stress distribution by three-dimensional analysis. The stress distribution was also measured with ten stress meters installed in each section in the direction of maximum and minimum initial stresses. As a result, it was clarified that the maximum and minimum lining stresses occurred in the inner bottom in the direction of the minimum initial stress and in the inner top in the direction of the maximum initial stress, respectively, and the more than 10 MPa stress inclination between them occurred in 60 cm thick and 2 m high concrete lining. (author)

Part of:
Proceedings of the 40th symposium on rock mechanics

Additional details

Publishing Information

Imprint Title
Proceedings of the 40th symposium on rock mechanics
Imprint Pagination
439 p.
Journal Page Range
p. 7-12

Conference

Title
40. symposium on rock mechanics
Dates
13-14 Jan 2011
Place
Tokyo (Japan)

Optional Information

Notes
This CD-ROM can be used for WINDOWS 9x/NT/2000/ME/XP/VISTA, MACINTOSH; Acrobat Reader is included; Data in PDF format, Folder Name: pdf, Paper ID: 2.pdf