Published January 26, 1995 | Version v1
Report Open

Heat exchanger bypass test report

Description

This test report documents the results that were obtained while conducting the test procedure which bypassed the heat exchangers in the HC-21C sludge stabilization process. The test was performed on November 15, 1994 using WHC-SD-CP-TC-031, ''Heat Exchanger Bypass Test Procedure.'' The primary objective of the test procedure was to determine if the heat exchangers were contributing to condensation of moisture in the off-gas line. This condensation was observed in the rotameters. Also, a secondary objective was to determine if temperatures at the rotameters would be too high and damage them or make them inaccurate without the heat exchangers in place

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE95006781; NTIS; US Govt. Printing Office Dep.

Files

26045368.pdf

Files (710.2 kB)

Name Size Download all
md5:6e2f509614ff9e024e2918676abd6ac3
710.2 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
18 p.
Report number
WHC-SD--CP-TRP-060

Optional Information

Contract/Grant/Project number
Contract AC06-87RL10930
Funding organization
USDOE, Washington, DC (United States).