Published 1988 | Version v1
Miscellaneous

Lab-scale fuel fabrication facility

  • 1. National Research Centre, Cairo (Egypt). Metallurgy Lab.

Description

A lab-scale fuel fabrication plant of several kilograms/year capacity is described. Zoning of the different activities along with a layout of the machinery and equipment are shown. A comprehensive description of the equipment is also given. The chemical processes associated with the production include precipitation (AUC process), followed by filtration, calcination, pelletization, sintering and grinding. A description of the fabrication of fuel pins (50 cm long) of uranium dioxide pellets, cladded in zircaloy tubing, is also included. The QC procedures associated with all stages in the plant are also indicated. Future plans for irradiation, post irradiation examination, and reporting of the fuel behaviour are also discussed

Part of:
Proceedings of the international symposium on uranium and electricity

Additional details

Additional titles

Subtitle (English)
Planning and implementation

Publishing Information

Imprint Title
Proceedings of the international symposium on uranium and electricity
Imprint Pagination
411 p.
Journal Page Range
p. 8.11-8.15.
Report number
INIS-mf--12807

Conference

Title
International symposium on uranium and electricity.
Dates
18-21 Sep 1988.
Place
Saskatoon, SK (Canada).

INIS

Country of Publication
Canada
Country of Input or Organization
Canada
INIS RN
22033571
Subject category
S11: NUCLEAR FUEL CYCLE AND FUEL MATERIALS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
FABRICATION; FUEL PELLETS; FUEL PINS; QUALITY CONTROL; URANIUM DIOXIDE
Descriptors DEC
ACTINIDE COMPOUNDS; CHALCOGENIDES; CONTROL; FUEL ELEMENTS; OXIDES; OXYGEN COMPOUNDS; REACTOR COMPONENTS; URANIUM COMPOUNDS; URANIUM OXIDES

Optional Information