Published February 1988 | Version v1
Journal article

Quality control and its increase in NPP construction in France

Description

A quality control (QC) system for civil engineering and installation works during NPP construction in France is described. Three QC levels are specified: the first one is intended for conducting QC on each operation, the second one is for QC realization by administration using geodetic equipment as well as defectoscopy including laser and radiation ones. At the third level the QC is accomplished by EdF which performs a wide range of activities which are to be realized prior to the NPP construction initiation

Additional details

Additional titles

Original title (Russian)
Контрол' и повышение качества строительства AEhS во Франции

Publishing Information

Journal Title
Ehnerg. Stroit. Rubezhom
Journal Issue
no.1
Series
Ehnerg. Stroit. Rubezhom.
CODEN
ESRBB

INIS

Country of Publication
USSR
Country of Input or Organization
USSR
INIS RN
19096131
Subject category
S29: ENERGY PLANNING, POLICY AND ECONOMY;
Descriptors DEI
CONSTRUCTION; NUCLEAR POWER PLANTS; ORGANIZING; QUALITY ASSURANCE; QUALITY CONTROL
Descriptors DEC
CONTROL; NUCLEAR FACILITIES; POWER PLANTS; THERMAL POWER PLANTS