Published 1995 | Version v1
Report Open

Hydrogen Evolution and Sludge Suspension During the Preparation of the First Batch of Sludge at the Savannah River Site

Description

The first batch of High Level Radioactive Sludge for the Defense Waste Processing Facility is being prepared in two 4.9 million liter waste tanks. The preparation involves removing water soluble salts by washing (water addition, sludge suspension, settling and decantation). Sludge suspension is accomplished using long shafted slurry pumps that are mounted on rotating turntables. During the sludge suspension runs in 1993 and 1994, the slurry pumps' cleaning radius was determined to be less than that expected from previous determinations using synthetic sludge in a full size waste tank mockup. Hydrogen concentrations in the tanks' vapor space were monitored during the sludge suspension activities. As expected, the initial agitation of the sludge increased the hydrogen concentration, however, with the controls in place the hydrogen concentration was maintained below seven percent of the lower flammability limit

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE95060090; NTIS; US Govt. Printing Office Dep.

Files

26045514.pdf

Files (487.2 kB)

Name Size Download all
md5:556671d6ad1b092a912d455393a4ecb3
487.2 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
9 p.
Report number
WSRC-MS--94-0541

Conference

Title
Waste management '95.
Dates
26 Feb - 2 Mar 1995.
Place
Tucson, AZ (United States).

Optional Information

Contract/Grant/Project number
Contract AC09-89SR18035
Funding organization
USDOE, Washington, DC (United States).
Secondary number(s)
CONF-950216--33.