Published April 2018 | Version v1
Book

Discussion on the assembly and installation of passive pressurized water reactor water storage tank

  • 1. China Nuclear Industry Fifth Construction Co., Ltd., jinshan, Shanghai (China)

Description

CB20 large structural module which is the passive pressurized water reactor water storage tank is the main structure of AP1000 nuclear power plant building, and its cross-section is a trapezoidal barrel structure module. CB20 module has the features of over-sized submodule, complicated structure and difficult anti-deformation control and large welding quantity etc. After the installation and setting of CB20, the theoretical water storage capacity of PCCWST (PCS-Passive Containment Cooling System) will be 2970 t. After the installation, PCCWST and shield wall are integrated by the concrete placement, the PCCWST will be used to store spray water for cooling. The stored water can ensure the 72 hours continuing spraying. Therefore, it is crucial to ensure the construction quality during module assembly, so as to ensure final installation quality. This article describes the main assembly and installation process of CB20 module, analyses the difficulties during the assembly and proposes a series of solutions to water storage tank module assembly platform, sub-module delivery dimension, diagonal plate fitting-up sequence, welding deformation control, key dimension control as well as installation construction activities etc, so as to supply construction experience for the other water storage tank assembly and installation and improve and innovate previous construction process. (authors)

Part of:
Progress report on nuclear science and technology in China (Vol.5). Proceedings of academic annual meeting of China Nuclear Society in 2017, No.8--Nuclear Techniques in Industry sub-volume

Additional details

Publishing Information

Publisher
China Atomic Energy Press
Imprint Place
Beijing (China)
ISBN
978-7-5022-8776-4
Imprint Title
Progress report on nuclear science and technology in China (Vol.5). Proceedings of academic annual meeting of China Nuclear Society in 2017, No.8--Nuclear Techniques in Industry sub-volume
Imprint Pagination
241 p.
Journal Page Range
p. 100-109

Conference

Title
2017 academic annual meeting of China Nuclear Society
Dates
16-18 Oct 2017
Place
Weihai (China)

Optional Information

Notes
15 figs., 2 refs.