Investigation of condensed matter fusion
Description
Work on muon-catalyzed fusion led to research on a possible new type of fusion occurring in hydrogen isotopes embedded in metal lattices. While the nuclear-product yields observed to date are so small as to require careful further checking, rates observed over short times appear sufficiently large to suggest that significant neutrons and triton yields could be realized -- if the process could be understood and controlled. During 1990, we have developed two charged-particle detection systems and three new neutron detectors. A segmented, high-efficiency neutron counter was taken into 600 m underground in a mine in Colorado for studies out of the cosmic-ray background. Significant neutron emissions were observed in this environment in both deuterium-gas-loaded metals and in electrolytic cells, confirming our earlier observations
Availability note (English)
MF available from INIS under the Report Number; OSTI as DE91007246;NTIS;INIS; US Govt. Printing Office Dep.
Files
Additional details
Additional titles
- Subtitle (English)
- Annual progress report, March 15, 1990--December 1990
Publishing Information
- Imprint Pagination
- 14 p.
- Report number
- DOE/ER/12105--1
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 22035565
- Subject category
- S74: ATOMIC AND MOLECULAR PHYSICS; S70: PLASMA PHYSICS AND FUSION TECHNOLOGY;
- Resource subtype / Literary indicator
- Progress Report
- Descriptors DEI
- CHARGED PARTICLE DETECTION; CRYSTAL LATTICES; METALS; MUON-CATALYZED FUSION; NEUTRON DETECTION; NEUTRON EMISSION; PROGRESS REPORT; TRITIUM
- Descriptors DEC
- BETA DECAY RADIOISOTOPES; BETA-MINUS DECAY RADIOISOTOPES; CRYSTAL STRUCTURE; DETECTION; ELEMENTS; EMISSION; HYDROGEN ISOTOPES; ISOTOPES; LIGHT NUCLEI; NUCLEAR REACTIONS; NUCLEI; NUCLEOSYNTHESIS; ODD-EVEN NUCLEI; RADIATION DETECTION; RADIOISOTOPES; SYNTHESIS; THERMONUCLEAR REACTIONS; YEARS LIVING RADIOISOTOPES
Optional Information
- Contract/Grant/Project number
- Contract FG02-90ER12105