Technical evaluation report TMI action -- NUREG-0737 (II.D.1). Relief and safety valve testing, Watts Bar Nuclear Plant, Units 1 and 2 (Dockets 50-390 and 50-391)

Description

In the past, safety and relief valves installed in the primary coolant system of light water reactors have performed improperly. As a result, the authors of NUREG-0578 (TMI-2 Lessons Learned Task Force Status Report and Short-Term Recommendations) and, subsequently, NUREG-0737 (Clarification of TMI Action Plan Requirements) recommended development and completion of programs to do two things. First, they should reevaluate the functional performance capabilities of pressurized water reactor safety, relief, and block valves. Second, they should verify the integrity of the pressurizer safety and relief valve piping systems for normal, transient, and accident conditions. This report documents the review of those programs by Lockheed Idaho Technologies Company. Specifically, this report documents the review of the Watts Bar Nuclear Plant, Units 1 and 2, Applicant response to the requirements of NUREG-0578 and NUREG-0737. This review found the Applicant provided an acceptable response reconfirming they met General Design Criteria 14, 15, and 30 of Appendix A to 10 CFR 50 for the subject equipment. It should also be noted Lockheed Idaho performed this review for both Units 1 and 2. However, the applicability of this review to Unit 2 depends on verifying that the Unit 2 as-built system conforms to the Unit 1 design reviewed in this report

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE95008662; NTIS.

Files

26060168.pdf

Files (650.3 kB)

Name Size Download all
md5:4ec4418ccf4beca70978b036068b3c1b
650.3 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
27 p.
Report number
INEL--94/0277