Published September 9, 1994 | Version v1
Report Open

Work plan for testing silicone impression material and fixture on pool cell capsule

Description

The purpose of this work plan is to provide a safe procedure to test a cesium capsule impression fixture at Waste Encapsulation and Storage Facility (WESF). The impression will be taken with silicone dental impression material pressed down upon the capsule using the impression fixture. This test will evaluate the performance of the fixture and impression material under high radiation and temperature conditions on a capsule in a WESF pool cell

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE95003058; NTIS; US Govt. Printing Office Dep.

Files

26034199.pdf

Files (1.2 MB)

Name Size Download all
md5:2ebff5f84c24208b7e405fc139412797
1.2 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
5 p.
Report number
WHC-SD--WM-WP-286

Optional Information

Contract/Grant/Project number
Contract AC06-87RL10930
Funding organization
USDOE, Washington, DC (United States).