Published May 1993 | Version v1
Report Open

Performance of the ALS injection system

Description

The authors started commissioning the Advanced Light Source (ALS) storage ring on January 11, 1993. The stored beam reached 60 mA on March 24, 1993 and 407 mA on April 9, 1993. The fast pace of storage ring commissioning can be attributed partially to the robust injection system. In this paper they describe the operating characteristics of the ALS injection system

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE93016961; NTIS; US Govt. Printing Office Dep.

Files

25010257.pdf

Files (129.9 kB)

Name Size Download all
md5:6fa87bada75c31642fe51dff009c2836
129.9 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
3 p.
Report number
LBL--33239

Conference

Title
International particle accelerator conference.
Dates
17-20 May 1993.
Place
Washington, DC (United States).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
25010257
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
ADVANCED LIGHT SOURCE; BEAM TRANSPORT; ELECTRON BEAM INJECTION; ELECTRON SOURCES; LINEAR ACCELERATORS; PARTICLE BOOSTERS; PERFORMANCE; RELATIVISTIC BEAM INJECTION
Descriptors DEC
ACCELERATORS; BEAM INJECTION; PARTICLE SOURCES; RADIATION SOURCES; STORAGE RINGS; SYNCHROTRON RADIATION SOURCES

Optional Information

Contract/Grant/Project number
Contract AC03-76SF00098
Funding organization
USDOE, Washington, DC (United States).
Secondary number(s)
CONF-930511--226.