Published May 2009 | Version v1
Miscellaneous

Fault Tree Development of Kori Nuclear Unit 2 for Regulatory PSA Model

  • 1. ENESYS Co., Daejeon (Korea, Republic of)
  • 2. Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

Description

The purpose of this study is to develop fault trees of regulatory Probabilistic Safety Assessment model for independent risk evaluation of Kori Nuclear Unit 2, and to gain regulatory perspectives and insights through this study

Part of:
Proceedings of the KNS spring meeting

Additional details

Publishing Information

Publisher
KNS
Imprint Place
Daejeon (Korea, Republic of)
Imprint Title
Proceedings of the KNS spring meeting
Imprint Pagination
[1 CD-ROM]
Journal Page Range
[2 p.]

Conference

Title
2009 spring meeting of the KNS
Dates
18-23 May 2009
Place
Jeju (Korea, Republic of)

INIS

Country of Publication
Korea, Republic of
Country of Input or Organization
Korea, Republic of
INIS RN
40099570
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
FAULT TREE ANALYSIS; HAZARDS; KORI-2 REACTOR; PROBABILITY; REGULATIONS; SAFETY ANALYSIS
Descriptors DEC
ENRICHED URANIUM REACTORS; LAWS; POWER REACTORS; PWR TYPE REACTORS; REACTORS; SYSTEM FAILURE ANALYSIS; SYSTEMS ANALYSIS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS

Optional Information

Notes
4 refs, 4 figs