Published April 1983 | Version v1
Report Open

Options to upgrade the Mirror Fusion Test Facility

Description

In this document we describe three options for upgrading MFTF-B, and the nomenclature used for these options is shown on the chart, MFTF-B Upgrade Options. We propose to add a 4-m-long reactor-like insert to the central cell, or to change the end plugs to the new MARS-type configuration, or both. LLNL prefers the third option, labeled MFTF-α+T in the chart, in which both the central cell insert is added and the end plugs are modified. All options are long-pulse or steady-state DT burning experiments. Those upgrades with the insert would be constructed beginning in FY 86, with operation beginning in mid-FY 92. Confirmation of our intent to modify the end plugs would be sought in FY 88 based on positive results from MFTF-B experiments. The upgrade with only the end plug modification would not start until MFTF-B data are available. The timeline for constructing and operating the MFTF-B Upgrade included at the end of this preface is for reference while reading the text. The various modes of operation shown on the chart are described later

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS, PC A09/MF A01; 1 as DE83009696.

Files

14777681.pdf

Files (3.4 MB)

Name Size Download all
md5:62204391c3901db9eb08917f664dfa7c
3.4 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
182 p.
Report number
UCID--19743

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
14777681
Subject category
S70: PLASMA PHYSICS AND FUSION TECHNOLOGY;
Descriptors DEI
MAGNET COILS; MFTF DEVICES; PLANNING; SPECIFICATIONS; THERMONUCLEAR IGNITION
Descriptors DEC
ELECTRIC COILS; ELECTRICAL EQUIPMENT; EQUIPMENT; MAGNETIC MIRRORS; OPEN PLASMA DEVICES; THERMONUCLEAR DEVICES