Helium/helium intermediate heat exchanger (URKO): 2nd semi-annual report 1987. Period August to December 1987

Description

Automatic translation: By changing the pipe brackets, there is no need in the pipe field 48 tubes. The thermal calculation resulted in an increase in the straight pipe length by 2 x 400 mm. The bending of the Pipes in the deflection area with the load case ''Leave to stand hot'' conditional a larger outer diameter of the tube bundle. Through this the backflow jacket and the tank pressure jacket by 100 mm larger in diameter. The flow jackets were due to the Experience with the 10 MW test component from the holding jacket attached separately to the ring tube plate. Between inner and outer flow jacket became a rigid connection created.

Abstract (German)

Durch die Änderung der Rohrhalterungen entfallen im Rohrfeld 48 Rohre. Die wärmetechnische Berechnung ergab hierfür eine Vergrößerung der geraden Rohrlänge um 2 x 400 mm. Das Ausbiegen der Rohre im Umlenkbereich beim Lastfall ''Heiß Stehenlassen'' bedingt einen größeren äußeren Durchmesser des Rohrbündels. Hierdurch wird der Rückströmmantel und der Behälterdruckmantel um 100 mm im Durchmesser größer. Die Strömungsmäntel wurden auf Grund der Erfahrungen bei der 10 MW Testkomponente vom Haltemantel getrennt an der Ringrohrplatte befestigt. Zwischen inneren und äußeren Strömungsmantel wurde eine biegesteife Verbindung geschaffen.
Part of:
Interim reports 170 MW

Additional details

Additional titles

Original title (German)
Helium/Helium-Zwischenwärmetauscher (URKO): 2. Halbjahresbericht 1987. Zeitraum August bis Dezember 1987

Publishing Information

Imprint Title
Interim reports 170 MW
Imprint Pagination
188 p.
Journal Page Range
p. 183-188
Report number
INIS-DE--21M0684

Optional Information

Notes
Document from Juelich Preservation Project; Figs. Imprint:Figs.;Zwischenberichte 170 MW