Pre-operational testing of TFTR systems
Description
The Tokamak Fusion Test Reactor (TFTR) is composed of 21 major systems, all of which must function in order to meet project objectives. To assure adequate, timely and reliable function of these systems, a sequence of tests is planned for various levels of assembly. The test sequence is keyed to initial operational phases. Additional tests are planned for later operational phases leading to full power performance with deuterium and tritium. The overall test sequence is intended to expose design and fabrication problems as early as possible for corrective action to minimize impact on the schedule. Operational tests begin at low power levels and progress in steps to design levels while critical parameters are monitored. The sequence of tests required to meet the goals of initial TFTR operation is described. (author)
Additional details
Publishing Information
- Publisher
- Pergamon Press.
- Imprint Place
- Oxford (UK)
- ISBN
- 0 08 029977 6
- Imprint Title
- Fusion technology 1982. Proceedings of the 12. symposium held in Juelich, 13-17 September 1982. 2 v.
- Imprint Pagination
- 1532 p.
- Journal Page Range
- v.1 p. 291-295.
Conference
- Title
- Fusion technology 1982.
- Dates
- 13-17 Sep 1982.
- Place
- Juelich (Germany, F.R.).
INIS
- Country of Publication
- United Kingdom
- Country of Input or Organization
- United Kingdom
- INIS RN
- 15068994
- Subject category
- S70: PLASMA PHYSICS AND FUSION TECHNOLOGY;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- ELECTRIC GENERATORS; ENERGY STORAGE SYSTEMS; MAGNET COILS; PERFORMANCE TESTING; PRESSURE VESSELS; SAFETY; SAFETY ENGINEERING; TFTR DEVICE; VACUUM SYSTEMS
- Descriptors DEC
- CLOSED PLASMA DEVICES; CONTAINERS; ELECTRIC COILS; ELECTRICAL EQUIPMENT; EQUIPMENT; TESTING; THERMONUCLEAR DEVICES; TOKAMAK DEVICES
Optional Information
- Notes
- Imprint:Price Pound125.00.