Published October 1988 | Version v1
Journal article

Construction of foundation slab of Temelin reactor building

  • 1. Vodni Stavby, Prague (Czechoslovakia)
  • 2. Vystavba Jaderne Elektrarny Temelin, Tyn nad Vltavou (Czechoslovakia)

Description

The concreting is described of the foundation slab under the WWER-1000 reactor in the Temelin nuclear power plant. The slab area is 68x68 m and thickness 2.4 m. For ease of concreting, the slab was divided in 12 blocks with vertical partition walls of steel mesh. The total thickness was concreted in three stages in which the partial thicknesses slightly differed for operating reasons. The first two partial thicknesses were concreted in layers of 0.45 m each, the third thickness consisted of two layers of 0.30 m each. The reinforcement was completely cleaned of the concrete residues from the previous stages in the break between the second and the third stages. Totally, 11,050 m3 concrete were used. Briefly described is quality control during concreting and experiences and recommendations are summed up for other concreting jobs. (Z.M.). 19 figs

Additional details

Additional titles

Original title (Czech)
Vystavba zakladove desky budovy reaktoru v Temeline

Publishing Information

Journal Title
Stavby Jadrovej Energetiky
Journal Issue
no.4-5
Series
Stavby Jadrovej Energ.
CODEN
SJEND

Optional Information

Notes
English translation available from Nuclear Information Center, 156 16 Prague 5-Zbraslav, Czechoslovakia at US$ 10 per page.