Climax spent fuel dosimetry. Progress report, September 1980-September 1981
Description
This progress report covers dosimetry work at the Climax Spent Fuel Test Facility up to September 1981. During this time the gamma calibrations were completed, the temperature-induced fading study was completed, the first set of exposed dosimeters was retrieved, and the second set of dosimeters was placed in the field. These were installed in stainless steel tubes located on the inside wall of five canister emplacement holes (0.61 m in diameter), numbers 1, 3, 4, 7, and 11. Hole 3 also had dosimeters in similar stainless steel tubes placed at radii of 0.51 and 0.66 m from the canister centerline. Data obtained from the first exposure (about 270 days in duration) are reported. Significant neutron exposures were measured; in some cases they were sufficiently high that neutron spectra could be calculated
Availability note (English)
MF available from INIS under the Report Number; Available from NTIS, PC A03/MF A01; 1 as DE86011495.
Files
Additional details
Publishing Information
- Imprint Pagination
- 30 p.
- Report number
- UCRL--15419
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 18002948
- Subject category
- S12: MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; S46: INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND TECHNOLOGY;
- Resource subtype / Literary indicator
- Numerical Data, Progress Report
- Descriptors DEI
- CALIBRATION; DOSEMETERS; EXPERIMENTAL DATA; GAMMA DOSIMETRY; GRANITES; NEUTRON DOSIMETRY; NEVADA; RESEARCH PROGRAMS; SPENT FUELS; STOPPING POWER; TESTING
- Descriptors DEC
- DATA; DEVELOPED COUNTRIES; DOSIMETRY; ENERGY SOURCES; FUELS; IGNEOUS ROCKS; INFORMATION; MATERIALS; MEASURING INSTRUMENTS; NORTH AMERICA; NUCLEAR FUELS; NUMERICAL DATA; PLUTONIC ROCKS; REACTOR MATERIALS; ROCKS; USA
Optional Information
- Notes
- Portions of this document are illegible in microfiche products.
- Secondary number(s)
- EGG--1183-2432.