The construction of the direct beam transport line for the PF-AR

  • 1. High Energy Accelerator Research Organization (KEK), Tsukuba, Ibaraki (Japan)

Description

We have a construction project of a new beam transport line (BT) for the Photon Factory Advanced Ring (PF-AR). The injection energy of the PF-AR was 2.5∼3.0 GeV and the accumulated beam was accelerated to 6.5 GeV. The new BT will connect from the LINAC end to the PF-AR in an approximately straight line and will become independent of the SuperKEKB BT. It enables the full energy injection, and the top-up injection will be realized as a simultaneous continuous injection with the other storage rings, High Energy Ring (HER), Low Energy Ring (LER) of SuperKEKB and Photon Factory Storage Ring (PF ring). The new BT tunnel and the building were completed in 2014, and the installation of infrastructures was also completed in 2015. The whole project is planned to be finished in 2017 before the commissioning of the SuperKEKB Phase 2. (author)

Part of:
Proceedings of the 13th annual meeting of Particle Accelerator Society of Japan

Additional details

Publishing Information

Imprint Title
Proceedings of the 13th annual meeting of Particle Accelerator Society of Japan
Imprint Pagination
1420 p.
Journal Page Range
p. 567-570

Conference

Title
13. annual meeting of Particle Accelerator Society of Japan
Acronym
PASJ2016
Dates
8-10 Aug 2016
Place
Chiba (Japan)

Optional Information

Notes
6 refs., 7 figs.