Fuji test beam line (FTBL) (2). Construction

  • 1. High Energy Accelerator Research Organization, Tsukuba, Ibaraki (Japan)

Description

The FUJI test beam line (FTBL), which was being built in the Fuji experimental hall of the KEKB accelerator, was completed in September 2007. Soon after the KEKB operation started in October, the first beam was observed to pass through the FTBL successfully. The hardware system, their installation and alignment are presented. (author)

Additional details

Publishing Information

Journal Title
Kasokuki
Journal Volume
4
Journal Issue
4
Journal Page Range
p. 318-325
ISSN
1349-3833

Optional Information

Notes
2 refs., 17 figs., 1 tab.