Published 1995 | Version v1
Book

Disposition of already separated plutonium in Russia: Consideration of short- and long-term options

Creators

  • 1. Moscow Inst. of Physics and Technology (Russian Federation). Center for Arms Control

Description

The plutonium stockpile presents a serious risk to national and international security. However, the utilization of already separated plutonium involves a complex set of political, technical, economical, and environmental problems. How Russia can best deal with all the problems associated with plutonium stockpiles is the subject of this paper. The official Russian concept of plutonium utilization views it as a valuable energy source. This concept entails the following two measures: (1) storage of both surplus weapons and civil plutonium; (2) fabrication of MOX fuel for future use in a different type of reactor: light-water reactors and fast-neutron reactors. To implement this concept, building four 800-Megawatt fast-neutron reactors and completing the construction of MOX plant is proposed. Technical and economical evaluations are being conducted on plutonium utilization in VVER-1000 reactors. When operating, these reactors (four BN-800 and seven VVER-1000) could dispose of about 9 tons of plutonium per year. But given Russia's current chaotic political and economic conditions, it seems unlikely that these plans will be carried out any time soon. Furthermore, the comparative economic analysis conducted for the different types of fuel cycles shows that due to several factors there is no economic motivation for Russia to use plutonium for fuel fabrication in the near future. These observations indicate that the real question that needs to be answered is what priority needs to be placed on short-, medium-, and long-term to identify and choose between different disposition options? This question is easily answered when one considers the currently turbulent political and economic situation in Russia. The priority that makes the most sense is to concentrate efforts on short-term options

Additional details

Publishing Information

Publisher
American Society of Mechanical Engineers.
Imprint Place
New York, NY (United States)
ISBN
0-7918-1219-7
Imprint Title
Fifth international conference on radioactive waste management and environmental remediation -- ICEM '95: Proceedings. Volume 1: Cross-cutting issues and management of high-level waste and spent fuel
Imprint Pagination
900 p.
Journal Page Range
p. 499.

Conference

Title
5. international conference on radioactive waste management and environmental remediation.
Dates
3-9 Sep 1995.
Place
Berlin (Germany).

Optional Information

Secondary number(s)
CONF-950917--.