Published 1993 | Version v1
Report

Physics requirements of Commissioning diagnostics for SSCL linac

  • 1. Superconducting Super Collider Lab., Dallas, TX (United States)
  • 2. Allied Signal, Kansas City, MO (United States)

Description

Commissioning diagnostics are described in terms of the beam physics requirements of the SSCL linac. Commissioning diagnostics include current monitors, beam position monitors, spectrometer, foil scattering experiment, wire scanners, Faraday cups, and bunch shape monitors. Two DOE integrated contractors, the Superconducting Super Collider Laboratory and Allied Signal, Kansas City Plant, are developing the commissioning diagnostics. The need to measure bright, short linac beam pulses requires special design considerations. High density harps and collectors with up to 50 wires per cm and 128 wires total, and fast, 3.5-MHz amplifiers have been developed. The diagnostics will be first used and tested during beam commissioning of the RFQ

Additional details

Publishing Information

Imprint Title
Proceedings of the 1993 Particle Accelerator Conference: Volume 3
Imprint Pagination
970 p.
Journal Page Range
p. 2124-2126.
Report number
DOE/ER/40779--1-Vol.3

Conference

Title
international particle accelerator conference.
Acronym
PAC '93
Dates
17-20 May 1993.
Place
Washington, DC (United States).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
26025397
Subject category
S43: PARTICLE ACCELERATORS; S42: ENGINEERING;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
DESIGN; ION BEAMS; MEASURING INSTRUMENTS; QUADRUPOLE LINACS; SPECIFICATIONS; SUPERCONDUCTING SUPER COLLIDER
Descriptors DEC
ACCELERATORS; BEAMS; CYCLIC ACCELERATORS; LINEAR ACCELERATORS; STORAGE RINGS; SYNCHROTRONS

Optional Information

Contract/Grant/Project number
Contract AC35-89ER40486
Secondary number(s)
CONF-930511--Vol.3.